Click "View" to go to the board report detail page.
Click "Download" to download a copy of board report and its attachments.
| 19. |
2025-0464 WITHDRAWN: AUTHORIZE the Chief Executive Officer to:
A. AWARD a seven-year, firm fixed unit rate contract, Contract No. OP128598000 to EO Charging US, Inc., for the acquisition and ... Withdrawn |
View
|
Download
|
| 20. |
2025-0471 AUTHORIZE the Chief Executive Officer to award a firm-fixed price contract, Contract No. DR124275(2)000 to Martinez Engineering, LLC for the Metro E Line Underground Tunnel Radio System ... None |
View
|
Download
|
| 21. |
2025-0695 AUTHORIZE the Chief Executive Officer to award a two-year, Indefinite Delivery/Indefinite Quantity (IDIQ) Contract No. MA125897000 to Safety Vibe, Inc., the lowest responsive and responsible ... None |
View
|
Download
|
| 22. |
2025-0746 AUTHORIZE the Chief Executive Officer to award a firm fixed unit rate Contract No. OP127011(2)0008370 to Majestic Fire Inc., DBA Kord Fire Protection, to provide chemical fire suppression ... None |
View
|
Download
|
| 23. |
2025-0852 AUTHORIZE the Chief Executive Officer (CEO) to:
A. AWARD a five-year firm fixed unit rate Contract No. PS131648000 to Intueor Consulting, Inc. to provide program support for the implementation ... None |
View
|
Download
|
| 24. |
2025-0859 CONSIDER:
A. FINDING that the procurement of Metro Bus Engine Cooling System Rebuild Kit under Public Utilities Code (PUC) Section 130237, as an Original Equipment Manufacturer (OEM) item, ... None |
View
|
Download
|
| 25. |
2025-0861 APPROVING a total of $9,918,750 for the continued Direct Annual Allocation for Transit Service on the I-110 and I-10 ExpressLanes for Fiscal Year 2026 (FY26) as shown in Attachment A. None |
View
|
Download
|
| 26. |
2025-0967 AUTHORIZE the Chief Executive Officer to:
A. AWARD a firm fixed unit rate Contract No. OP91160(3)001R1 for Region 1 to BriteWorks, Inc. to provide graffiti abatement services in the ... None |
View
|
Download
|
| 27. |
2025-0860 RECEIVE AND FILE status report on the bus and rail service changes effective Sunday, December 14, 2025. None |
View
|
Download
|
| 28. |
2025-0884 RECOGNIZE Operations Employees of the Month. None |
View
|
Download
|
| 29. |
2025-0885 RECEIVE oral report on Metro Operations. None |
View
|
Download
|
| 18. |
2025-0921 RECEIVE AND FILE a feasibility study of water taxi service between San Pedro and Long Beach (Attachment A). None |
View
|
Download
|
| 30. |
2025-0824 AUTHORIZE the Chief Executive Officer to:
A. RECEIVE AND FILE quarterly status report on the ZEB Program;
B. UTILIZE the Washington Department of Enterprise Services Contract or Colorado ... None |
View
|
Download
|
| 31. |
2025-0891 RECEIVE AND FILE the Public Safety Report. None |
View
|
Download
|
|
2025-0982 RECEIVE General Public Comment None |
View
|
Download
|