Click "View" to go to the board report detail page.
Click "Download" to download a copy of board report and its attachments.
| 10. |
2025-1062 CONSIDER:
A. APPROVING the Locally Preferred Alternative (LPA) as Modified Alternative 5: Heavy rail transit underground between the Van Nuys Metrolink Station and the E Line Expo/Sepulveda ... Approved |
View
|
Download
|
| 11. |
2025-0818 CONSIDER:
A. APPROVING the Board selected Locally Preferred Alternative (LPA), a 4.5-mile fully grade-separated light rail extension of the C Line Extension to Torrance (now K Line) with two ... None |
View
|
Download
|
| 12. |
2025-0906 CONSIDER:
A. APPROVING $59,296,086 in additional programming within the capacity of Measure R Multimodal Highway Subregional Programs, along with funding changes via the updated project list ... Approved |
View
|
Download
|
| 13. |
2025-0945 RECEIVE AND FILE status report on Countywide Planning Major Project Status Report. None |
View
|
Download
|
|
2025-1091 RECEIVE General Public Comment None |
View
|
Download
|