Click "View" to go to the board report detail page.
Click "Download" to download a copy of board report and its attachments.
5. |
2020-0255 RECEIVE AND FILE the response to Board Motion Item 8.1 (Attachment A, Legistar File 2020-0172) on the February 2020 Board report, Eastside Transit Corridor Phase 2 (Attachment B, Legistar File ... None |
View
|
Download
|
6. |
2020-0276 AUTHORIZE the Chief Executive Officer to:
A. AWARD four, three-year base on-call contracts, with two, one-year option terms, Contract Nos. AE67946000, AE67946001, AE67946002, AE67946003 to ... None |
View
|
Download
|
7. |
2019-0882 APPROVE the release of Draft 2020 Long Range Transportation Plan (LRTP) for public comment. None |
View
|
Download
|
8. |
2020-0111 CONSIDER:
A. ADOPTING First/Last Mile Plan for Purple Line Extension Sections 2 & 3; and
B. DIRECTING staff to return to the Board with implementation recommendations following completion ... None |
View
|
Download
|
9. |
2020-0208 CONSIDER:
A. APPROVING revisions to the Metro Affordable Transit Connected Housing Program (MATCH Program), as further described in Attachment A; and
B. AUTHORIZING the CEO or his designee ... None |
View
|
Download
|
10. |
2020-0326 AUTHORIZE the Chief Executive Officer to:
APPROVE programming of additional $12.9 million in Measure R I-710 Early Action projects funds for the design phase of the Shoemaker Bridge ... None |
View
|
Download
|
11. |
2020-0199 CONSIDER:
A. RECEIVING AND FILING the Centinela Grade Separation Screening Analysis for Design Concepts/Engineering Design Report;
B. APPROVING Project Definition as an Aerial Grade Separation ... None |
View
|
Download
|
33. |
2020-0349 RECEIVE AND FILE Mobility on Demand Pilot Project report. None |
View
|
Download
|
|
2020-0336 RECEIVE General Public Comment None |
View
|
Download
|